Fig. 2From: Unknown HIV status and the TB/HIV collaborative control program in Ethiopia: systematic review and meta-analysisFunnel plot in which the vertical line provides an estimate of the effect size and the diagonal line shows the precision of individual studies with 95% confidence intervalsBack to article page