Skip to main content

Table 1 Problem structuring framework

From: Model to support intervention prioritization for the control of Aedes aegypti in Brazil: a multi-criteria approach

Preliminary Stage

Modelling Stage

Finalization Stage

1. Characterize decision maker(s) and other actors;

6. Preferences modelling;

9. Evaluate alternatives;

2. Identify goals;

7. Intra-criterion evaluation;

10. Perform Sensitivity analysis;

3. Establish criteria;

8. Inter-criteria evaluation;

11. Analyse results and suggest;

4. Establish the problem and alternatives;

 

12. Implementing the decision.

5. Identify uncontrolled factors;