| Relative excess risk | Attributable proportion | Synergy index | |||
---|---|---|---|---|---|---|
Point estimation | 95%CI | Point estimation | 95%CI | Point estimation | 95%CI | |
WC and TG | 0.53 | (−0.40–1.46) | 0.25 | (−0.15–0.65) | 1.91 | (0.47–7.70) |
BP and TG | 0.31 | (−0.66–1.27) | 0.15 | (−0.30–0.60) | 1.42 | (0.43–4.70) |
BP and WC | 0.03 | (−0.89–0.94) | 0.01 | (−0.38–0.40) | 1.02 | (0.51–2.03) |