Parameter | Value (SE) | t | P | [95% Conf. Interval] |
---|---|---|---|---|
Number of products types | ||||
 Intercept | 420.92 (11.39) | 36.99 | < 0.001 | [397.71, 444.13] |
 Pre-intervention slope a | 2.51 (1.04) | 2.41 | 0.022 | [0.38, 4.64] |
 Post-intervention slope c | 30.02 (5.38) | 5.58 | < 0.001 | [19.04, 40.99] |
 Change in slope b | 27.50 (5.43) | 5.07 | < 0.001 | [16.43, 38.57] |
 Level change in intervention | 119.42 (60.21) | 1.98 | 0.056 | [−3.39, 242.23] |
Procurement volumes of all LCMs (packages) | ||||
 Intercept | 2,071,127.00 (117,796.50) | 17.58 | < 0.001 | [1,830,880.00, 2,311,375.00] |
 Pre-intervention slope a | 19,771.37 (12,044.75) | 1.64 | 0.111 | [− 4794.06, 44,336.80] |
 Post-intervention slope c | 4.74e+ 05 (6.08e+ 04) | 7.79 | < 0.001 | [350,000.00, 598,000.00] |
 Change in slope b | 454,101.60 (61,447.83) | 7.39 | < 0.001 | [328,777.90, 579,425.30] |
 Level change in intervention | − 282,740.10 (382,843.10) | −0.74 | 0.466 | [−10,635,540.00, 498,073.70] |
Procurement volumes of 154 LCMs (packages) | ||||
 Intercept | 1,905,371.00 (122,873.70) | 15.51 | < 0.001 | [1,654,768.00, 2,155,973.00] |
 Pre-intervention slope a | 12,562.22 (11,348.67) | 1.11 | 0.277 | [−10,583.56, 35,707.99] |
 Post-intervention slope c | 2.42e+ 05 (3.70e+ 04) | 6.52 | < 0.001 | [166,000.00, 317,000.00] |
 Change in slope b | 229,092.10 (38,127.01) | 6.01 | < 0.001 | [151,331.50, 306,852.60] |
 Level change in intervention | −151,236.50 (292,263.30) | −0.52 | 0.609 | [− 747,311.30, 444,838.30] |
Average delivery time of all LCMs (days) | ||||
 Intercept | 30.55 (0.91) | 33.66 | < 0.001 | [28.70, 32.40] |
 Pre-intervention slope d | −1.21 (0.07) | −16.66 | < 0.001 | [− 1.36, − 1.06] |
 Post-intervention slope e | −0.08 (0.06) | −1.40 | 0.171 | [−0.20, 0.04] |
 Change in slope b | 1.13 (0.09) | 12.19 | < 0.001 | [0.94, 1.32] |
 Level change in intervention | 1.08 (0.87) | 1.24 | 0.223 | [−0.69, 2.86] |