Skip to main content

Table 2 Key IDSR performance indicators before and after revitalisation of the IDSR program

From: Evaluation of integrated disease surveillance and response (IDSR) core and support functions after the revitalisation of IDSR in Uganda from 2012 to 2016

Indicator Target Before After
2004 2011 2012 2013 2014 2015 2016
National level indicators
 Completeness of reporting (%)
  Monthly 80 99.0 79.0 69.0 91.2 97.6 100 100
  Weekly 80 96.0 71.5 56.2 61.0 51.2 68.8 78.0
 Timeliness of reporting (%)
  Monthly 80 88.0 69.1 58.9 73.1 82.0 86.5 92.5
  Weekly 80 96.0 55.0 40.3 42.1 50.0 57.8 68.3
 Cholera case fatality rate (%) < 1 2.4 2.2 3.2 3.6 2.8 2.3 2.1
 Annualized Non-Polio AFP Rate (per 100,000 population below 15 years) ≥4.0a 2.2 2.6 2.8 2.8 3.2 3.3 3.7
 Sent feedback to district level (%) 100 100 100.0
District level indicators
 Analysed data on priority diseases (%) 100 75.0 61.5
 Suspected outbreaks notified to MoH within 48 h (%) 100 46.0 57.7
 Laboratory confirmation for the most recent outbreak (%) 100 61.0 73.1
 District Surveillance Focal Person (%) 100 96.2
 District Laboratory Focal Person (%) 100 100.0
 Functional epidemic preparedness and response committee (%) 100 65.0 69.2
 Sent feed back to lower levels (%) 100 55.0 86.6
  1. aThis is a target adopted by Uganda